nigig-org/tools
andodeki 61f39b2424
Some checks failed
nigig-site / Owned paths and honest test contracts (push) Has been cancelled
nigig-site / Cargo check-all-targets (push) Has been cancelled
nigig-site / Cargo clippy-site-owned (push) Has been cancelled
nigig-site / Cargo contained-media-export-fixtures (push) Has been cancelled
nigig-site / Cargo containment-storage-crypto (push) Has been cancelled
nigig-site / Cargo core-clippy (push) Has been cancelled
nigig-site / Cargo core-contracts (push) Has been cancelled
nigig-site / Cargo integration-non-live (push) Has been cancelled
nigig-site / Cargo production-dependency-containment (push) Has been cancelled
nigig-site / Cargo site02-crypto (push) Has been cancelled
nigig-site / Cargo site02-repository (push) Has been cancelled
nigig-site / Cargo site02-store (push) Has been cancelled
nigig-site / Cargo unit (push) Has been cancelled
nigig-site / SITE-02 native provider/filesystem (macos-latest) (push) Has been cancelled
nigig-site / SITE-02 native provider/filesystem (ubuntu-latest) (push) Has been cancelled
nigig-site / SITE-02 native provider/filesystem (windows-latest) (push) Has been cancelled
nigig-site / SITE-02 desktop runtime and normal shutdown (push) Has been cancelled
nigig-site / SITE-02 migration, recovery, and fault corpus (push) Has been cancelled
nigig-site / Media limits (explicitly skipped until enabled) (push) Has been cancelled
nigig-site / Real server interoperability (explicitly skipped until enabled) (push) Has been cancelled
nigig-site / Security and supply-chain baseline (push) Has been cancelled
repo hygiene / hygiene (push) Has been cancelled
nigig-site / Release capability gate (push) Has been cancelled
chore(site-02): Phase 0 freeze record, reviewer assignment scaffolding, governance state
- Pin RC hash 0480b2d8e8 (tag site-02-rc1) as the
  only commit SITE-02 Phase 1-5 evidence may cite.
- Record SHA-256 digests of the security-relevant files at the frozen hash and
  the frozen tree hash, so later phases can re-verify before citing.
- Record reviewer/owner assignment state: all 11 human roles PENDING ASSIGNMENT;
  AI identities and AI signatures are invalid for these roles by construction.
- Record applied governance: fail-closed Actions variables
  (NIGIG_SITE_02_SECURITY_APPROVED=false, NIGIG_SITE_02_APPROVED_COMMIT=sentinel
  that never matches a SHA), exact-commit gate verified at
  .forgejo/workflows/nigig-site.yml:936-950, exact-hash CI dispatch baseline.
- Stage branch/tag protection payloads in tools/site02/phase0/ (application
  requires repo-admin permission the scoped token lacks).
- Keep every gate tripwire intact: header UNASSIGNED markers and NOT APPROVED /
  PROPOSED decisions unchanged; the release gate still fails closed.

Phase-0-freeze: 0480b2d8e8
Recorded-by: AI agent (Arena.ai Agent Mode) under repo-owner authorization,
scoped API token, 2026-09-27
2026-09-27 18:49:02 +00:00
..
analysis wip(daily-reports): preserve local site/report/worker, ocr and lite-common updates for Phase 0 freeze 2026-09-27 16:25:50 +03:00
site02/phase0 chore(site-02): Phase 0 freeze record, reviewer assignment scaffolding, governance state 2026-09-27 18:49:02 +00:00
cargo_makepad chore: sync full working tree to gitdab 2026-09-12 07:15:24 +03:00
check-no-pin-capture.sh fix(tools): make test scripts executable for CI runners 2026-08-17 09:57:13 +00:00
check-pdf-external-readers.sh feat(pdf): encryption on save — AES-128 and AES-256 (Phase 6, part one) 2026-08-18 07:27:45 +00:00
makepad-native-libs.sh docs(test): document portable Makepad library helper invocation 2026-08-16 18:01:16 +00:00
run_map_tests.sh fix(tools): make test scripts executable for CI runners 2026-08-17 09:57:13 +00:00
test-cad-coverage.sh ci(cad): CORE-00 CAD-owned workflow plus fail-closed stale scans 2026-09-14 11:25:09 +03:00
test-cad-widget-coverage.sh ci(cad): CORE-00 CAD-owned workflow plus fail-closed stale scans 2026-09-14 11:25:09 +03:00
test-doc-engine-coverage.sh test(doc-engine): isolated source-coverage harness with floors 2026-08-17 04:33:08 +00:00
test-doc-workspace-coverage.sh test(doc): doc-workspace coverage harness with enforced floors 2026-08-17 10:25:27 +00:00
test-email-coverage.sh chore: sync full working tree to gitdab 2026-09-12 07:15:24 +03:00
test-mpesa-store-clean.sh fix(tools): make test scripts executable for CI runners 2026-08-17 09:57:13 +00:00
test-p2p-app-smoke.sh feat(p2p-intel): the exchange tab becomes spread intelligence, with rails, drift capture, and three of four limits closed 2026-09-01 16:07:43 +00:00
test-p2p-coverage.sh feat(p2p-intel): the exchange tab becomes spread intelligence, with rails, drift capture, and three of four limits closed 2026-09-01 16:07:43 +00:00
test-payment-phase0.sh fix(tools): make test scripts executable for CI runners 2026-08-17 09:57:13 +00:00
test-pdf-coverage.sh feat(pdf): image embedding and header/footer stamping — Phase 4 complete 2026-08-16 22:27:32 +00:00
test-rust-clean.sh fix(test): invoke Makepad native preflight via bash 2026-08-16 17:56:29 +00:00
test-spreadsheet-coverage.sh feat(spreadsheet): dropdown cells and button cells (#9 remainder, complete) 2026-08-21 04:52:00 +00:00