4 commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
c92e67fbd8 |
test(nigig-traffic): TRAFFIC-14 enable GUI runtime tests (4/4 green under Xvfb)
- Remove all ignores in tests/ui.rs; harness failure was the broken pin plus no display. CI runs them via xvfb-run (xvfb, libgl1-mesa-dri). - HUD test: HUD is raw draw_text, not widgets; assert view survives Intro->Driving and capture screenshot instead of invisible selectors. - Docs: release gate ticked, blocker 2 closed, 430px HUD clipping noted. Verified: 121 pass / 0 fail / 0 ignored; clippy 0 owned; fmt; diff --check. |
||
|
|
5aac7e3920 |
fix(nigig-traffic): TRAFFIC-01 close P0-01 — coherent Makepad pin, green build/tests
Some checks failed
nigig-site / SITE-02 desktop runtime and normal shutdown (push) Has been cancelled
nigig-site / SITE-02 migration, recovery, and fault corpus (push) Has been cancelled
nigig-site / Media limits (explicitly skipped until enabled) (push) Has been cancelled
nigig-site / Real server interoperability (explicitly skipped until enabled) (push) Has been cancelled
nigig-site / Security and supply-chain baseline (push) Has been cancelled
nigig-site / Release capability gate (push) Has been cancelled
cad / cad-truth-gates (push) Has been cancelled
cad / cad-core-checks (push) Has been cancelled
cad / cad-consumers (push) Has been cancelled
doc-engine / engine (push) Has been cancelled
doc-engine / coverage (push) Has been cancelled
doc-engine / consumer (push) Has been cancelled
email / gates (push) Has been cancelled
email / email-domain (push) Has been cancelled
email / nigig-email (push) Has been cancelled
email / supply-chain (push) Has been cancelled
nigig-build (CAD) / supply-chain (push) Has been cancelled
nigig-build (CAD) / cad-module (push) Has been cancelled
nigig-build (CAD) / full-crate-check (push) Has been cancelled
nigig-build (CAD) / cad-engine-coverage (push) Has been cancelled
nigig-build (CAD) / doc-workspace-coverage (push) Has been cancelled
nigig-build (CAD) / cad-widget-coverage (push) Has been cancelled
nigig-map / test (push) Has been cancelled
sms / gates (push) Has been cancelled
sms / robius-sms (push) Has been cancelled
sms / android (push) Has been cancelled
sms / nigig-sms (push) Has been cancelled
sms / supply-chain (push) Has been cancelled
spreadsheet / engine-coverage (push) Has been cancelled
spreadsheet / ui-controller-coverage (push) Has been cancelled
- Re-pin workspace makepad b580de1 -> a3d8f521 (fork branch nigig-traffic-camera-boom-fix: 5-arg camera_boom_limit callers + EntityLocal particle anchor port). Cargo.lock updated atomically. - Fix Walk literal broken by upstream fields (scenarios.rs). - First executed test run: reword two completion strings that tripped the banned-claim gate (gate unchanged). - Zero Traffic-owned compiler/clippy diagnostics; cargo fmt. - Docs: plan status + release gates, IMPLEMENTATION_STATUS round 3. Verified: check --all-targets clean; test 117 pass / 0 fail / 4 ignored (GUI); clippy 0 owned diagnostics; fmt; diff --check. |
||
| 1516aa747b | Initial project: app scope + Makepad skeleton | |||
| ac8f8aa002 |
chore: sync full working tree to gitdab
Some checks failed
nigig-build (CAD) / cad-module (push) Has been cancelled
nigig-build (CAD) / full-crate-check (push) Has been cancelled
nigig-build (CAD) / cad-engine-coverage (push) Has been cancelled
nigig-build (CAD) / doc-workspace-coverage (push) Has been cancelled
nigig-build (CAD) / cad-widget-coverage (push) Has been cancelled
traffic / gates (push) Has been cancelled
traffic / nigig-traffic (push) Has been cancelled
traffic / supply-chain (push) Has been cancelled
doc-engine / engine (push) Has been cancelled
doc-engine / coverage (push) Has been cancelled
doc-engine / consumer (push) Has been cancelled
email / gates (push) Has been cancelled
email / email-domain (push) Has been cancelled
email / nigig-email (push) Has been cancelled
email / supply-chain (push) Has been cancelled
nigig-map / test (push) Has been cancelled
sms / gates (push) Has been cancelled
sms / robius-sms (push) Has been cancelled
sms / android (push) Has been cancelled
sms / nigig-sms (push) Has been cancelled
sms / supply-chain (push) Has been cancelled
spreadsheet / engine-coverage (push) Has been cancelled
spreadsheet / ui-controller-coverage (push) Has been cancelled
p2p-intel / engine (push) Has been cancelled
p2p-intel / notifications (push) Has been cancelled
p2p-intel / coverage (push) Has been cancelled
p2p-intel / makepad-app (push) Has been cancelled
p2p-intel / exchange-tab (push) Has been cancelled
Payment domain, storage, platform and UI / isolated-payment-tests (push) Has been cancelled
Payment domain, storage, platform and UI / payment-ui-tests (push) Has been cancelled
Whole-tree sync: cad-core/cad-ui split sources, nigig-build construction_frame migration, pdf port progress, mpesa/pay/uikit/doc updates, workspace members/profiles/lock, CI workflows and reviews. See individual file history for details. |