8 commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
12f59109d7 |
revert(nigig-site): ce9e12b was wrong — the HTTP wire field is body, not text
Commits |
||
|
|
ac40ac923f |
fix(nigig-site): read the timeline field the protocol crate actually emits
Some checks failed
nigig-site / Cargo contained-media-export-fixtures (push) Has been cancelled
nigig-site / Cargo containment-storage-crypto (push) Has been cancelled
nigig-site / Cargo core-clippy (push) Has been cancelled
nigig-site / Cargo core-contracts (push) Has been cancelled
nigig-site / Cargo integration-non-live (push) Has been cancelled
nigig-site / Cargo production-dependency-containment (push) Has been cancelled
nigig-site / Cargo site02-crypto (push) Has been cancelled
nigig-site / Cargo site02-repository (push) Has been cancelled
nigig-site / Cargo site02-store (push) Has been cancelled
nigig-site / Cargo unit (push) Has been cancelled
nigig-site / SITE-02 native provider/filesystem (macos-latest) (push) Has been cancelled
nigig-site / SITE-02 native provider/filesystem (ubuntu-latest) (push) Has been cancelled
nigig-site / SITE-02 native provider/filesystem (windows-latest) (push) Has been cancelled
nigig-site / SITE-02 desktop runtime and normal shutdown (push) Has been cancelled
nigig-site / SITE-02 migration, recovery, and fault corpus (push) Has been cancelled
nigig-site / Media limits (explicitly skipped until enabled) (push) Has been cancelled
nigig-site / Real server interoperability (explicitly skipped until enabled) (push) Has been cancelled
nigig-site / Security and supply-chain baseline (push) Has been cancelled
nigig-site / Release capability gate (push) Has been cancelled
repo hygiene / hygiene (push) Has been cancelled
sms / gates (push) Has been cancelled
sms / robius-sms (push) Has been cancelled
sms / android (push) Has been cancelled
sms / nigig-sms (push) Has been cancelled
sms / supply-chain (push) Has been cancelled
spreadsheet / engine-coverage (push) Has been cancelled
spreadsheet / ui-controller-coverage (push) Has been cancelled
traffic / gates (push) Has been cancelled
traffic / nigig-traffic (push) Has been cancelled
traffic / supply-chain (push) Has been cancelled
Pinning nimanyatta-protocol's JSON shape exposed a live bug in the E2E
fixture, and answering "is nigig_common in this repo?" narrowed the SITE-12
gap.
The bug: MessageContent::Text serializes as {"Text":{"text":"..."}}.
tests/support/nimanyatta_fixture.rs::event_text only looked for
content.Text.body — a field that type never emits, and which
serde_json::from_str::<MessageContent> actively rejects. Against a real
server every message would have been skipped, sync_timelines would return an
empty vec, and live_round_trip would still have passed. A silently vacuous
interop test is exactly the failure mode SITE-00 exists to prevent.
- event_text now tries `text` first and keeps `body` as a fallback.
- New test in nimanyatta-protocol pins the serialized shape and asserts the
fixture's old guess does not decode.
- New cross-check test in the fixture builds its payload from the real
MessageContent type, so parser and protocol cannot diverge silently again.
What was verified and what was not:
- The protocol-crate tests run: 14 passed.
- The fixture cross-check test COULD NOT be compiled or run here. nigig-site's
test target pulls in makepad-widgets, which is SIGKILLed on this 2 vCPU /
1.9 GiB host. The parser change was instead verified by extracting
event_text/sync_timelines verbatim from the fixture into a standalone
harness: {"Text":{"text":"slab done"}} -> Some(("alice","slab done")),
the legacy {"Text":{"body":...}} shape still falls back, and a
non-message event returns None. That harness is not part of the shipped
tree; the shipped cross-check test is unverified until CI runs it.
Also recorded in EXECUTION_PLAN.md SITE-12: nigig_common is confirmed absent
from this repository (no package by that name; RoomEvent/RoomInfo/
JoinedRoomSync/SyncFilter/PaginationDirection defined nowhere here; nigig-core
is an email/IMAP crate), and it re-exports nimanyatta-protocol via a
`protocol` module — the server writes
nigig_common::protocol::{ClientToServerMsg, ServerToClientMsg}. So of the 75
items the server imports from nigig_common, 9 are the crate already pinned
here; the remaining 66 are the HTTP DTO layer, ~11 of which /sync needs.
Verified: cargo test -p nimanyatta-protocol = 14 passed; cargo test -p
nigig-site-core = 228 passed / 1 ignored; clippy -D warnings clean;
cargo fmt --check clean; cargo metadata exit 0; all 6 workflow python gates.
|
||
| 0819e97074 |
feat(nigig-site): compile and test the hardening core; add SITE-20..28 domain
Some checks failed
email / gates (push) Has been cancelled
nigig-site / Security and supply-chain baseline (push) Has been cancelled
nigig-site / Release capability gate (push) Has been cancelled
repo hygiene / hygiene (push) Has been cancelled
cad / cad-truth-gates (push) Has been cancelled
cad / cad-core-checks (push) Has been cancelled
cad / cad-consumers (push) Has been cancelled
doc-engine / engine (push) Has been cancelled
doc-engine / coverage (push) Has been cancelled
doc-engine / consumer (push) Has been cancelled
email / email-domain (push) Has been cancelled
email / nigig-email (push) Has been cancelled
email / supply-chain (push) Has been cancelled
nigig-build (CAD) / supply-chain (push) Has been cancelled
nigig-build (CAD) / cad-module (push) Has been cancelled
nigig-build (CAD) / full-crate-check (push) Has been cancelled
nigig-build (CAD) / cad-engine-coverage (push) Has been cancelled
nigig-build (CAD) / doc-workspace-coverage (push) Has been cancelled
nigig-build (CAD) / cad-widget-coverage (push) Has been cancelled
nigig-map / test (push) Has been cancelled
sms / gates (push) Has been cancelled
sms / robius-sms (push) Has been cancelled
sms / android (push) Has been cancelled
sms / nigig-sms (push) Has been cancelled
sms / supply-chain (push) Has been cancelled
spreadsheet / engine-coverage (push) Has been cancelled
spreadsheet / ui-controller-coverage (push) Has been cancelled
traffic / gates (push) Has been cancelled
traffic / nigig-traffic (push) Has been cancelled
traffic / supply-chain (push) Has been cancelled
Thirteen hardening modules (3,079 lines) sat in nigig-site/src/ declared in no
mod statement. They had never been compiled or tested: cargo check never saw
them, and the plan's "implemented in the worktree and pending verification"
status was unverifiable by construction.
Extract the UI-free core into crates/apps/nigig-site-core (scope 5's "Rust core
crate ... testable; safe"; plan 6's target architecture). nigig-site depends on
it and re-exports it, so there is one copy of each module source: the app and
the core's unit tests compile the same files. The core has no Makepad
dependency, so its contracts run on a memory-limited runner.
Compiling that code for the first time found four real defects, all fixed:
- Role/Capability lacked Ord, so every BTreeSet of them failed to compile
(auth.rs)
- CaptureResult::empty never initialised site_id from its site parameter
(ocr_policy.rs)
- negotiate_version(2, 5) agreed on a protocol the peer never offered, which is
the silent downgrade the function exists to prevent (sync_protocol.rs)
- an absurd frame size returned Overflow instead of the actionable budget
breach (media_bounds.rs)
New feature-tranche domain modules, each with unit tests:
- organisation.rs SITE-20 invites, per-site roles, the 4.2 matrix as testable
data, site registry with geofence, settings
- report_pack.rs SITE-21 report numbering, entry status, signatures binding
actor/device/timestamp/document hash, lock and versioning,
multi-site compilation, monthly packs
- site_diary.rs SITE-22 weather with provenance, plant, deliveries, delay
log where a weather delay needs supporting rainfall,
visitors, manpower by trade
- workforce.rs SITE-23 consent-gated registration, tag-only blocklist,
attendance with overtime, QR badges, payroll CSV that never
emits identity, offboarding tombstones
- programme.rs SITE-25 dependencies with cycle detection and rollback,
topological order, critical path, frozen baselines with
slippage, checklists gating approval, snags, RFIs,
variations needing two distinct approvers
- hse.rs SITE-28 append-only incidents, closure requires corrective
action, toolbox talks, inspections, monthly statistics
workflows.rs gains the FR-1.14 Locked state; commands.rs gains a bounded
non-empty text validator shared by the new modules.
CI: the SITE-02 crypto/repository/store lanes pointed at -p nigig-site, where
those suites no longer live; left alone they would have compiled nothing and
reported a vacuous green. Repointed at the core, and added core-contracts and
core-clippy lanes with a ">=100 tests collected" check so a lane cannot pass
vacuously. All six existing Python contract gates still pass.
Auto-purge of worker ID data refuses to run until the scope 18 retention
question is answered rather than inventing a window.
Verified 2026-09-26: cargo test -p nigig-site-core --locked = 175 passed,
0 failed, 1 ignored (needs a live Secret Service session); cargo clippy -p
nigig-site-core --all-targets --no-deps -- -D warnings clean; cargo check -p
nigig-site clean. cargo test -p nigig-site is still killed by SIGKILL compiling
makepad-widgets on a 2 GB host, as recorded in plan 2.1.
EXECUTION_PLAN.md gains a per-tranche status ledger (1a) that states plainly
which tranches are done, domain-only, externally blocked, or not started, and
records that this branch and main diverged at
|
|||
|
|
bbce8fb015 | harden SITE-02 repository and native vault contracts | ||
|
|
6d6f887ba6 | site: harden SITE-02 process and scope boundaries | ||
|
|
8dbfae8f72 | site: add SITE-02 encrypted repository candidate | ||
|
|
5d2d890f70 |
feat(nigig-site): enforce SITE-01 fail-closed containment
Some checks failed
nigig-site / Migration and recovery (explicitly skipped until enabled) (push) Has been cancelled
nigig-site / Media limits (explicitly skipped until enabled) (push) Has been cancelled
nigig-site / Real server interoperability (explicitly skipped until enabled) (push) Has been cancelled
nigig-site / Security and supply-chain baseline (push) Has been cancelled
nigig-site / Release capability gate (push) Has been cancelled
repo hygiene / hygiene (push) Has been cancelled
doc-engine / engine (push) Has been cancelled
doc-engine / coverage (push) Has been cancelled
doc-engine / consumer (push) Has been cancelled
email / gates (push) Has been cancelled
email / email-domain (push) Has been cancelled
email / nigig-email (push) Has been cancelled
email / supply-chain (push) Has been cancelled
nigig-build (CAD) / supply-chain (push) Has been cancelled
nigig-build (CAD) / cad-module (push) Has been cancelled
nigig-build (CAD) / full-crate-check (push) Has been cancelled
nigig-build (CAD) / cad-engine-coverage (push) Has been cancelled
nigig-build (CAD) / doc-workspace-coverage (push) Has been cancelled
nigig-build (CAD) / cad-widget-coverage (push) Has been cancelled
nigig-map / test (push) Has been cancelled
sms / gates (push) Has been cancelled
sms / robius-sms (push) Has been cancelled
sms / android (push) Has been cancelled
sms / nigig-sms (push) Has been cancelled
sms / supply-chain (push) Has been cancelled
spreadsheet / engine-coverage (push) Has been cancelled
spreadsheet / ui-controller-coverage (push) Has been cancelled
traffic / gates (push) Has been cancelled
traffic / nigig-traffic (push) Has been cancelled
traffic / supply-chain (push) Has been cancelled
Contain production capabilities, remove the production sync surface, and keep legacy media/export/transport implementations test-only. Require authenticated existing-key storage with preservation-first recovery and sticky write disablement, backed by deterministic fault and concurrency tests plus dependency and workflow contracts. |
||
| ac8f8aa002 |
chore: sync full working tree to gitdab
Some checks failed
nigig-build (CAD) / cad-module (push) Has been cancelled
nigig-build (CAD) / full-crate-check (push) Has been cancelled
nigig-build (CAD) / cad-engine-coverage (push) Has been cancelled
nigig-build (CAD) / doc-workspace-coverage (push) Has been cancelled
nigig-build (CAD) / cad-widget-coverage (push) Has been cancelled
traffic / gates (push) Has been cancelled
traffic / nigig-traffic (push) Has been cancelled
traffic / supply-chain (push) Has been cancelled
doc-engine / engine (push) Has been cancelled
doc-engine / coverage (push) Has been cancelled
doc-engine / consumer (push) Has been cancelled
email / gates (push) Has been cancelled
email / email-domain (push) Has been cancelled
email / nigig-email (push) Has been cancelled
email / supply-chain (push) Has been cancelled
nigig-map / test (push) Has been cancelled
sms / gates (push) Has been cancelled
sms / robius-sms (push) Has been cancelled
sms / android (push) Has been cancelled
sms / nigig-sms (push) Has been cancelled
sms / supply-chain (push) Has been cancelled
spreadsheet / engine-coverage (push) Has been cancelled
spreadsheet / ui-controller-coverage (push) Has been cancelled
p2p-intel / engine (push) Has been cancelled
p2p-intel / notifications (push) Has been cancelled
p2p-intel / coverage (push) Has been cancelled
p2p-intel / makepad-app (push) Has been cancelled
p2p-intel / exchange-tab (push) Has been cancelled
Payment domain, storage, platform and UI / isolated-payment-tests (push) Has been cancelled
Payment domain, storage, platform and UI / payment-ui-tests (push) Has been cancelled
Whole-tree sync: cad-core/cad-ui split sources, nigig-build construction_frame migration, pdf port progress, mpesa/pay/uikit/doc updates, workspace members/profiles/lock, CI workflows and reviews. See individual file history for details. |